How long does it take to build a website or web app?
By Grant Campanelli2 min read
Timelines are the second question after cost, and they're easier to answer honestly: most delays come from a handful of predictable causes, and a good process is mostly about avoiding them. Here's how projects run from kickoff to launch and where the time goes.
Rough timelines
- Marketing site or landing page: typically a few weeks from kickoff to launch, depending on the number of pages and how much of the content already exists.
- Custom web application: usually a few months for a first version — longer for products with many roles, billing, or complex integrations.
- Mobile app on an existing web product: shorter than the web build, since the backend is shared — plus app-store review time, which you don't control.
These aren't quotes. Every project gets a specific timeline in discovery, and that's the one I hold myself to.
Where the time goes
- Discovery. Goals, users, budget, and a written scope. Usually the shortest phase and the one that saves the most time later.
- Design. Look, flow, and screens — shared early so direction gets settled before production code. Most timeline risk lives here, because design changes are cheap now and expensive later.
- Build. Focused milestones with clickable previews at each step. You see working software throughout, not a reveal at the end.
- Launch. Domain, hosting, analytics, and — for mobile — App Store and Play Store review.
What makes projects run long
- Content arriving late. On marketing sites, waiting on copy, photos, and logos is the number one delay. Start gathering them before kickoff.
- Decisions by committee. One decision-maker with clear authority moves faster than a group that reconvenes weekly.
- Scope drift. “While we're in there” is how a six-week project becomes a four-month one. Fixed scope protects your timeline as much as your budget.
- Third-party surprises. A partner's API turns out to be undocumented, a store review bounces. These happen; a buffer in the plan absorbs them.
What makes projects ship early
- Examples of what you like. Screenshots, competitors, tools you already use.
- Existing content, even rough. A messy doc beats a blank page.
- Fast feedback on previews. A day's turnaround on each milestone compounds over a project.
- A clear version one. The smallest thing that changes how you work, with everything else on a list for version two.
Need it by a date?
Tell me the date and why it matters — a launch, a season, an event — and I'll tell you in discovery whether it's realistic and what scope fits inside it. Hard dates are workable; surprise dates are not.